Online Chat
Message
Facebook
YouTube
Twitter
LinkedIn

General Safety Operation Specifications for Crane Drivers

Publication Date: 2024-07-24

1. Handover and equipment inspection

First of all, the relevant personnel need to strictly implement the shift handover system, and carefully check the integrity and reliability of the hook, wire rope, brake and safety guards, once abnormalities are found, they should be reported immediately and take appropriate measures.

 

2. Safety check before starting the crane

Before starting the crane, it must be confirmed that the following safety conditions have been met:

·All controllers are zeroed to ensure that there is no risk of accidental start-up.

·There are no idle persons in the crane and its operation area, and the operating personnel have been evacuated to the safety zone.

·All obstacles are removed to ensure unobstructed crane operation.

·Ensure that the safety distance between the crane and the surrounding equipment or buildings is not less than 0.5 metres.

·The power disconnecting device has been properly locked or there is a clear warning sign.

·For mobile cranes, ensure that the working site is level and the outriggers are stable and reliable.

 

3. Warning and signalling

Before switching on and operating close to the personnel, must ring the bell or take other effective ways to warn. Strictly comply with the command signal operation, the emergency stop signal unconditional and immediate response.

 

4. Prohibited Behaviour

During operation, the following behaviours are strictly prohibited:

·Using the limiter instead of normal stopping operation.

·Braking by hitting the reverse carriage.

·Conducting inspection or maintenance during lifting operations.

·Adjusting the brake or increasing the operating range with the load.

·Passing the lifting object above the head of personnel, or standing under the lifting object and lifting arm.

 

5. Precise operation and test lifting

Strictly in accordance with the command signal operation, lifting load close to or reach the rated value, and lifting dangerous goods before, need to carefully check the brake, and a small height, short stroke test lifting, to confirm that there is no error before continuing operations.

 

6. Maintain a safe distance

Ensure that the distance between each part of the crane, lifting loads and auxiliary tools and power lines meets the safety standards to prevent electric shock accidents.

 

7. Unsafe conditions

In case of the following conditions, the operation should be stopped immediately:

·There is a safety hazard in the crane structure or key components.

·The hoist is overloaded, the weight is unknown, the bundle is unstable or there are other unsafe factors.

·Insufficient light in the operating environment affects sight or judgment.

 

8. Power failure treatment and restart

In case of sudden power failure during work, all controllers should be zeroed immediately and the main power supply should be switched off. After restoring the power supply, you need to check the status of the crane and confirm its safety before restarting.

 

9. The main and secondary hooks use rules

Unless the design permits, it is forbidden to work with the main and vice hoisting mechanism at the same time to avoid overload or operation conflict.

 

10. Joint lifting management

When multiple cranes are jointly lifting, it is necessary to ensure that each crane is not overloaded, and keep the wire rope vertical and running synchronously. In this process, there should be professional and technical personnel and safety personnel on-site guidance and supervision.

 

11`. Bad weather countermeasures

For open-air operation of rail cranes, when the wind exceeds 6, should stop working and anchor the crane to ensure equipment safety. After the work is finished, the same anchoring measures need to be taken to prevent the wind and other natural factors from affecting the safety of the equipment.

General Safety Operation Specifications for Crane Drivers

Special Recommendation

CRUKING 2023 Christmas & New Year's Party

CRUKING Visited International XIAMEN Stone Fair

CRUKING Luoyang Historical Outing

CRUKING Visited the XGMA factory

CRUKING Visited the JINGONG Plant

CRUKING Outing

CRUKING | KATOSCE HD27 Mini Excavator

CRUKING Mount Wuyi Outing

CRUKING | KATOSCE 18VX Mini Excavator

CRUKING | HANGCHA CPC35 Diesel Forklift

CRUKING's 2024 Halloween Theme Party

CRUKING | ZCJK QTY4 25 Brick Forming Machine

CRUKING Christmas Party in 2020

CRUKING | LIUGONG CLG877H Wheel Loader

CRUKING | LOVOL FL956H Wheel Loader

CRUKING | LIUGONG CLG848H Wheel Loader

CRUKING | SANY SY500H Excavator

CRUKING | SHANTUI SD22 Bulldozer

CRUKING | HBXG SD7K Bulldozer

CRUKING | LIUGONG CLG909E Excavator

CRUKING | ZOOMLION ZE360E Excavator

CRUKING | JINGONG JGM791FT50KN Forklift Loader

CRUKING | SANY SAC2200 All Terrain Crane

CRUKING | LOVOL Excavator FR480E

CRUKING | XCMG XE215C Excavator

CRUKING | XGMA XG8065F Excavator

CRUKING | SHANTUI SD16 Bulldozer

CRUKING | SANY SY365H Excavator

CRUKING | XGMA XG956N Wheel Loader

CRUKING | XCMG GR3505 Motor Grader

CRUKING | JINGONG JGM757KN Wheel Loader

CRUKING | JINGONG JGM761FT20KV Forklift Loader

MGMA MGM980HL Mining Forklift Loader | Xiamen Stone Fair 2022

CRUKING Team Enjoys Touring Guilin

CRUKING | JINGONG JGM9085LNZ Wheel Excavator

CRUKING | XCMG Crawler Excavators Show

FUDA FDM8300 Forklift | Xiamen Stone Fair 2022

CRUKING LOVOL Wheel Loader FL968H

CRUKING | JINGGONG JG75S-9 Wheeled Excavator

CRUKING | JINGONG JGM9085LZ-8G Excavator

CRUKING | XCMG LW1200KN Wheel Loader

CRUKING | YUANSHAN YS775-8Y Wheeled Excavator

CRUKING | SOCMA HNF160 Heavy Forklift

CRUKING | HBXG SD8N Bulldozer

CRUKING | JINGONG JG9095LNZ Wheeled Excavator

CRUKING | JINGONG JGM737K Wheel Loader

CRUKING | SOCMA HNF300 Heavy Forklift

CRUKING | JINGONG JGM9075LN-9 Wheel Excavator

CRUKING | JINGGONG JG50S Wheeled Excavator

CRUKING | JINGONG JGM767 Wheel Loader

Make Logistics Easier: ZHONGLI EPT20-20ETH Walkie Pallet Truck

CRUKING | JINGGONG JG150S Wheeled Excavator

CRUKING | JINGGONG JG120S Wheeled Excavator

KOMATSU PC56-7 Excavator: The Perfect Combination of Power & Efficiency

CRUKING | JINGONG JGM9075L Wheel Excavator

Machinery Showcase: XCMG XE75WG Wheeled Excavator

CRUKING | SOCMA HNBZ8512 Heavy Forklift

Efficient Construction Expert: XCMG XE135GA Excavator

CRUKING | SOCMA HNF250 Heavy Forklift

LIUGONG 906F Excavator Diversified Configurations Introduction

Cost-Effective Mini Excavator: LIUGONG 9035F

The Impressive Reach and Power of SANY SY60CPRO Excavator

XCMG XE60GA Excavator: Strength and Wisdom Go Hand in Hand

CRUKING | HELI CPCD25 Forklift

Elevating Construction Standards with XGMA Machinery

The Reliable Choice for Excavation Projects: XCMG XE200GH Excavator

Flexible Operation: XINYUAN B75ECO Wheeled Excavator

XCMG XE245GH Excavator Strength Showcase

Discover the Advantage of LIUGONG CLG816C Wheel Loader

LIUGONG 913EG4 Excavator: Master of Earthmoving Tasks

A Closer Look at the SANY SYM5445THBES Concrete Pump Truck

A Comprehensive Guide to HOWO Tractor with XGMA Machinery

Unleashing Efficiency: EP Electric Forklift for Material Handling

Double the Efficiency of ZHONGLI Pallet Stacker

SOCMA HNF1202 Heavy-Duty Forklift Features & Benefits

SOCMA HN30 Diesel Forklift Features & Benefits

More Efficient Cleaning: DONGFENG Garbage Truck

Boost Productivity with the SOCMA HNF1202 Heavy-Duty Forklift

Work Smarter with XCMG XE135WA Excavator

SOCMA HNT120 Hoisting Telehandles are Excellent Choice

HANGCHA CPCD30 Forklift Your Jobsite Partner

Take a Closer Look at the JINGGONG JG125Z Wheeled Excavator

BAOLI KBD30 Electric Forklift: Serious Power in Every Lift

LUOJIAN LZ310H Road Roller Helping Multiply Efficiency

CRUKING Celebrates Christmas and the Year Ahead

LIUGONG’s Unmanned Paving Contributes to Construction

ZOOMLIOM ZT82J: Performance at Ultra-High Altitudes Proven Once Again

Anhui Bound: CRUKING’s Team Building Trip

Excavator Exports Rose 32.7% in August

CRUKING Hosts 18th Anniversary Afternoon Tea Event

LGMG Develops an Integrated Solar-Storage-Charging Solution

Halloween Special Gathering: CRUKING Shares a Joyful Time

XCMG Successfully Hosts XGL630E-36S Tower Crane Product Launch Event


©Cruking 2008-2026 / All Rights Reserved.沪ICP备17022911号-7